Watford Tunnel Face, Hertfordshire, 6 June 1837.
3 1 c m
40cm
actual image size: 32cm x 23cm

Watford Tunnel Face, Hertfordshire, 6 June 1837.

Bourne, John Cooke

© NRM / Pictorial Collection / Science & Society Picture Library

Description

Coloured lithograph by J C Bourne from a series of prints showing the construction of the London & Birmingham Railway (LBR). In 1833 Robert Stephenson (1803-1859) was appointed chief engineer of the LBR, the first railway into London. Running from Curzon Street Station, Birmingham, to Euston Station, London, the 112 mile long line took 20,000 men nearly five years to build, at a cost of £ 5.5 million. Extensive quicksands made the digging of the Kilsby Tunnel in Northamptonshire one of the most difficult engineering challenges on the route. Eighteen working shafts were sunk to construct the tunnel, which took two years to complete, cost three times the estimate, and claimed the lives of 26 workers. The LBR opened on 17 September 1838.
 

Artist

 

Image Ref.

10301921
 

buy a print

Select size
 
Select finish
 
How many prints?
 
£20.00
 

buy a framed print

buy a canvas

buy a framed canvas