Channel Tunnel construction, 1993.
2 9 c m
actual image size: 32cm x 21cm

Channel Tunnel construction, 1993.

Hogg, Chris

© National Railway Museum / Science & Society Picture Library -- All rights reserved


Mouth of the Channel Tunnel, at Shakespeare Cliff, Dover, by Chris Hogg, 1993. This photograph was taken as the tunnel was being built. The tunnel took 7 years to build and finally opened in 1995. It cost £2,700 million to build. It created a rail link between London and Brussels and Paris, and connections to many other European cities.



Image Ref.


buy a print

Select size
Select finish
How many prints?

buy a framed print

buy a canvas

buy a framed canvas