Channel Tunnel construction, 1993.

Hogg, Chris

Channel Tunnel construction, 1993.
2 9 c m
40cm
actual image size: 32cm x 21cm

Description

Train at the mouth of the Channel Tunnel at Shakespeare Cliff, Dover, by Chris Hogg, 1993. This photograph was taken as the tunnel was being built. During the construction of the tunnel, many trains ran in and out of the tunnel, bringing spoil, workers and equipment in and out of the tunnel. The tunnel took 7 years to build and finally opened in 1995. It cost £2,700 million to build.

Image Details

Artist
 
Image Ref.
 
10449044

© National Railway Museum / Science & Society Picture Library -- All rights reserved

buy a print

Select size
 
Select finish
 
How many prints?
 
£20.00
 

buy a framed print

buy a canvas

buy a framed canvas